Introduction
The followinng is an example of the gas content variability from the Glenaras 17 well pilot. In 2023, production analysis suggested that the critical desoprtion pressure was actually 10% lower than estimated. A 10% reduction in gas saturation lowered the critical desorption pressure from 600 to 525 psi.
References:
-
David Casey “121 Mining Investment Presentation”, 9 - 10 May 2023, London.