Field Example: Evolution of Westside Completions

Introduction

Westsides key CSG assets in Queensland is the Greater Merdian Permits (a joint-venture with Mistui E&P). Located near Moura in Queensland’s Bowen Basin, the project delivered first gas in 1996. Since 2010, the project has been operated by Westside (51% interest holder). The project owns gas compression and pipeline infrastructure that delivers gas to both the GLNG project and the domestic gas market.

Completion Evolution

According to Gorton and Martin [2022], Westside has grown over the last 10 years increasing from 9 TJ/d to 42 TJ/d. One of the changes to the workflow was more efficient drainage. The image below shows the evolution of single laterals to dual and trilaterals (these are 2022 numbers)

Westside Completions.png

References:

  • J. Gorton, and M. Martin, The transformation of Australia’s first commercial CSG field into a major gas project: how innovation and subsurface understanding has driven its success, The APPEA Journal 62(1) 235-244 https://doi.org/10.1071/AJ21090